Visit the Flowline Manufacturing web site
Click on the advert above to visit the company web site

Product category: Waste-water handling, monitors + treatment
News Release from: Black and Veatch | Subject: Las Vegas SCOP
Edited by the Processingtalk Editorial Team on 31 August 2006

Design for effluent pipeline and tunnel
project

Request your FREE weekly copy of the Processingtalk email newsletter. News about Waste-water handling, monitors + treatment and more every issue. Click here for details.

Black and Veatch has commenced design work for a major effluent system conveyance and operations project, redirecting flows from Las Vegas Bay, using a 7.5 mile pipeline tunnel

Under an engineering services contract awarded by the Clean Water Coalition (CWC) in Nevada, Black and Veatch is serving as the lead design engineer for the Systems Conveyance and Operations Program (SCOP) pipeline and tunnel project that will convey effluent from CWC member agencies wastewater treatment plants to a new discharge location in Lake Mead Removing the effluent from the Las Vegas Wash and redirecting the discharge location from Las Vegas Bay to a location near Boulder Island will protect the quality of the water in Lake Mead

The need for a new discharge location is driven by increasingly stringent water quality regulations, increasing effluent flows, protection of a drinking water source, protection of the Las Vegas Wash and Bay - especially at the low lake levels caused currently by the drought - and continued reliance on Colorado River system return-flow credits earned by returning water to the river.

"Black and Veatch previously worked with the CWC to help develop and define SCOP, so the project team has a unique understanding of stakeholder interests and implementation complexities," said CWC Project Administrator Douglas Karafa.

Black and Veatch has responsibility for the 30 percent design of the entire SCOP system including the 7.5 mile tunnel through the River Mountain.

Black and Veatch is also responsible for preparing the geotechnical programme required for detailed design, conducting the subsurface investigation programme, determining the right-of-way requirements and performing the project survey.

The Black and Veatch team will review the final designs of all the project elements and provide design support during construction.

The SCOP project is an important aspect of the southern Nevada water resources management strategy.

The CWC and the Southern Nevada Water Authority are coordinating the placement of a new potable water intake and the effluent discharge location to provide the best water quality while ensuring capacity for the future.

"The system under design will give the CWC maximum flexibility for managing treated effluent," said Don Froehlich, Black and Veatch Project Director.

"Completion of the SCOP project will enhance the water quality of Lake Mead for Valley residents, visitors and millions of downstream water users despite increased effluent flows and decreased lake levels, and we're delighted to be part of a programme that will effectively serve the CWC member agencies".

Black and Veatch: contact details and other news
Email this article to a colleague
Register for the free Processingtalk email newsletter
Processingtalk Home Page

Search the Pro-Talk network of sites

Visit the Flowline Manufacturing web site