Latest news on Processingtalk categorised by supplier
Cinar
Address:
11 Elvaston Place
London
SW7 5QG
UK
Our RSS feed for news from Cinar
Request to receive our free email newsletter each week
Listing of all 2 news releases from Cinar:
Waste tyres in Polysius Calciner increased to 60%
Cinar mathematical modelling suggested site amendments to the waste tyre injection points on a cement plant Polysius pre-calciner, which led to the waste tyre loading being considerably increased
News from Cinar (23 October 2007)
Alternative fuels optimisation in a KHD calciner
Cinar carried out a mathematical study with the primary aim to increase the waste derived fuel contribution in a low-NO configuration of a coal-fired KHD pre-calciner on a cement plant
News from Cinar (17 October 2007)
