Product category:
Hazardous area interfaces, Enclosures
News Release from: EPG Companies | Subject: EPG breakout junction boxes
Edited by the Processingtalk Editorial
Team on 25 May 2004
Optimum landfill and remediation site
safety
EPG breakout junction boxes provide a simple way to disconnect power or sensor wires during maintenance or repair work and create a gas-tight seal between riser, well or sump and your control panel
EPG breakout junction boxes provide a simple and convenient way to disconnect power or sensor wires during maintenance and/or repair work and create a gas-tight seal between your riser, well or sump and your control panel Corrosive gases migrating through motor and sensor cable conduit to the controller is one of the largest contributors to early control panel failure
This article was originally published on Processingtalk on 26 Apr 2004 at 8.00am (UK)
Related stories
SCADA system monitors remote gas production site
SCADA Systems have been installed to monitor 24 Pemex remote natural gas production sites in rural Villa Hermosa, Mexico, using radio telemetry to monitor remote gas production sites
Not only can these gases increase the chance for explosions, they also can corrode the contacts and make wires brittle.
To simplify maintenance and repair, increase the safety and accuracy of your system and minimize costs by running shorter motor or sensor cable, simply install an EPG Breakout Box close to the side slope riser and then hardwire the breakout box to the controller.
The weatherproof NEMA 4x enclosed EPG Breakout Box comes equipped with a terminal strip to facilitate easy pump and sensor cable removal, a dryer tube and bellows to seal out moisture, a FNPT waterproof exit hub, and is available in a variety of configurations for one or more devices.
• EPG Companies: contact details and other news
• Email this article to a colleague
• Register for the free Processingtalk email newsletter
• Processingtalk Home Page

