Foster Wheeler to manage LNG terminal development
Foster Wheeler Global Engineering and Construction Group is to provide project management consultancy (PMC) services to Singapore LNG for the development of a liquefied-natural-gas (LNG) terminal.
Singapore LNG owns and oversees the LNG terminal's development.
The terminal, to be located on the south-western part of Jurong Island, Singapore, will have an initial capacity of 3.5 million tonnes per annum (Mtpa), with provisions for expansion to 6Mtpa, and is targeted to be ready for start-up in 2013.
Singapore LNG and Foster Wheeler will jointly manage the engineering, procurement and construction (EPC) contractor through an integrated project management team approach, which will allow Singapore LNG to be fully involved in the management of the design and construction activities.
Not what you're looking for? Search the site.
Browse by category
- Plant Instrumentation (6574)
- Process Control and Management (3028)
- Communications and HMI (2974)
- Process Plant and Equipment (7462)
- Processing Industry Events and Services (3617)
- News from specific industry sectors (2842)
- Environment, Pollution + Green Power (896)
- Air Pollution Monitor and Control (194)
- Liquid Waste and Pollution (45)
- Solid Waste Disposal and Land Pollution (148)
- Environment (59)
- Legislation: REACH, WEEE, RoHS, CRC, MCERTS (118)
- Events and Exhibitions (103)
- Climate Change and CO2/Carbon Capture (86)
- Green Energy Projects (85)
- CHP Projects (9)
- LNG and Gas Storage (29)
- Flow Measurement (946)
- Water Industry News (1550)
