Visit the Pro-Talk web site
Click on the advert above to visit the company web site

Product category: Plant Design and Construction
News Release from: Rittal | Subject: 4 pole Maxi-PLS
Edited by the Processingtalk Editorial Team on 30 September 2003

Rittal saves money on power distribution

Rittal's new 4 pole Maxi-PLS is a fully modular partially type tested system for numerous applications such as power distribution, variable speed drives, process and the utility industries

Rittal's new 4 pole Maxi-PLS which utilises the popular TS8 enclosure range is a fully modular partially type tested system for numerous applications such as power distribution, variable speed drives, process and the utility industries The components are supplied ready to install, allowing fast assembly without any form of drilling, sawing or bending

When considering a conventional ACB enclosure typically taking 24-36 hours to build, 4 pole Maxi outstrips this by taking an average of just 1 day.

With options of 2000amps or 3200amps the possibilities are endless and Maxi-PLS integrates with all commercially available Air Circuit Breakers to offer maximum investment return.

With a system so simple to purchase, install and later modify Maxi-PLS not only eliminates high labour costs but also takes away the worry of having to cope with a large power distribution system.

More information can be found in the new power distribution catalogue, available from Rittal, which also contains a full range of products to accessorise Maxi-PLS solutions. Request a free brochure from Rittal ...

Rittal: contact details and other news
Email this article to a colleague
Register for the free Processingtalk email newsletter
Processingtalk Home Page

Search the Pro-Talk network of sites

Visit the Dichtomatik web site
Visit the Pro-Talk web site