Product category:
Valve positioners and actuators
News Release from: Rotork Controls | Subject: Northern Pipeline Interconnector in Queensland
Edited by the Processingtalk Editorial
Team on 28 March 2008
Australia's 'droughtbuster' scheme
chooses Rotork
Rotork actuators and gearboxes will play a crucial water supply control role, mounted on fourteen 1000mm high pressure mainline gate valves on the Northern Pipeline Interconnector in Queensland
Water is front page news in Australia as it has become obvious that drought, climate change, population and consumption growth have combined to make the country's future water security a major social, environmental and political issue The Northern Pipeline Interconnector is a key part of the Queensland state government emergency drought strategy and will play an important role in the area water distribution grid, connecting dams, weirs and other water storage sites
This article was originally published on Processingtalk on 4 Mar 2003 at 8.00am (UK)
Related stories
Rotork wins orders from Mexican petroleum industry
Valve actuation specialist Rotork is supplying heavy duty electric and pneumatic actuators and two-wire control systems for important onshore and offshore petroleum projects in Mexico
Rotork supplies UK hydro-electric power station
Rotork electric valve actuators are contributing to a noteworthy renewable energy refurbishment programme at a power station owned by South West Water, England's largest hydro-electric power station
Australian valvemaker John Valves has been awarded one of the largest contracts on the project including the supply of fourteen 1000mm high pressure mainline gate valves.
Manufactured at Ballarat, all are either motorised with Rotork IQ70/IB12 actuator and gearbox combinations or fitted with Rotork Gears IS11 / AS5 'dual input' manual gearboxes.
Jeff Quarrell, National Sales and Operations Manager for the valve division, describes the mainline valves as: "arguably the most important in the pipeline structure".
"Rotork actuators have a long and successful track record for reliable, low maintenance service in the harsh extremes of the Australian climate.
We especially like the speed and efficiency of 'non-intrusive' commissioning provided by the Rotork IQ, together with the ability to download and analyse valve operating data to minimise routine maintenance.
These were all important considerations for us and the customer when we put together our total valve package for this project, which was won against stiff competition from other Australian and international companies".
The Northern Pipeline Interconnector is being constructed by the Southern Regional Water Pipeline Alliance, a joint venture between Abigroup, KBR and McConnell Dowell Constructions.
With the potential capacity to transport 65M Litres of potable water a day, the pipeline will link existing and potential future water sources throughout the Australian Sunshine Coast.
• Rotork Controls: contact details and other news
• Email this article to a colleague
• Register for the free Processingtalk email newsletter
• Processingtalk Home Page

