Product category:
Asset Management and maintenance planning
News Release from: Transmitton | Subject: Network Rail contracts
Edited by the Processingtalk Editorial
Team on 14 August 2006
New rail contracts for Transmitton
Transmitton has been commissioned by Network Rail to upgrade the Traction Power SCADA control equipment at Paddock Wood and to migrate the Slough electrical control room function to Romford ECR
Leading supplier of integrated control and asset management solutions to the rail industry, Transmitton, has been commissioned by Network Rail to upgrade the Traction Power SCADA (Supervisory Control and Data Acquisition) control equipment at Paddock Wood and to migrate the Slough electrical control room function to Romford ECR The project is due for completion in 2007
This article was originally published on Processingtalk on 19 Jan 2004 at 8.00am (UK)
Related stories
Passenger information system for St Pancras
Transmitton, international supplier of integrated system control and asset management solutions to the rail industry, will supply its Real Time Passenger Information System for St Pancras
Extension to Docklands Light Railway equipment
Transmitton upgrades and extends operational control facilities for the Docklands Light Railway equipment to support the extension to London City Airport
The SCADA master station is fundamental for controlling and monitoring the electrification assets of the rail network.
Based on a modern networking and open systems environment, it has in-built flexibility and allows for future expansion.
The new dual redundant master station will be seamlessly connected with existing sub station equipment and also provides capability for renewal and expansion.
A training system that simulates the operational Electrical Control Room area will be used for electrical control operator scenario training with simulated plant responses.
Transmitton account manager Annemarie Green said, "We are delighted to be working on this significant upgrade for Network Rail.
Our systems are designed to be adaptable, allowing for future expansion while ensuring that operational continuity is delivered".
The highly skilled and experienced team working on this project is led by Ian Toplis, Senior Project Manager.
He has a proven record of project achievements in the rail industry, including the successful management of the main sub-contracts for the East Coast Mainline.
• Transmitton: contact details and other news
• Email this article to a colleague
• Register for the free Processingtalk email newsletter
• Processingtalk Home Page

