Product category:
Pumps, Vacuum pumps
News Release from: Wilo (UK) | Subject: Wilo-Block-BN
Edited by the Processingtalk Editorial
Team on 14 February 2003
Wilo pumps safeguard a flexible future
Wilo Wilo-Block-BN end suction pumps and variable speed drives are part of a strategic maintenance programme at Gateshead Leisure Centre for their hot water and air-conditioning system
The pumps and inverters will ensure that the Centre hot water and air-conditioning system will be able to adapt to changing demands brought about by future facility developments The maintenance programme was instigated following the demise of the water boilers, which had passed their economic working life expectancy
This article was originally published on Processingtalk on 21 Jan 2003 at 8.00am (UK)
Related stories
Safe sewage lifting pump
Wilo Pumps has launched a new sewage lifting system providing both reliable and safe pump operation, for servicing single or multi-family residential dwellings and commercial property
New glanded pump has high efficiency
Wilo introduces a range of single and double-headed glanded cast-iron pumps designed to provide high levels of operating efficiency along with low operating costs for water-based pumping duties
Following the complete failure of one of the boilers, a plan was drafted to replace the three existing boilers and rejuvenate the system pumps.
The resulting GBP100,000 phased programme has required the specification of eight end-suction pumps, an in-line glanded pump and a small secondary hot water return from Wilo UK.
To ensure flexibility, each IP55 enclosed pump will be installed with a variable speed drive, which will adjust the pump output to meet changing demand.
The associated inverters will be housed in a control panel featuring a digital display, which has been purpose-built by Wilo.
Key to the success of the project is the Wilo-Block-BN end-suction pump, which exactly match the dimensions of the existing infrastructure, thereby minimising the need for pipe modifications.
With a cast iron spiral volute, the Wilo-Bloc-BN pumps also incorporate direct drive flange-mounted motors, which provide vibration-free operation, and bi-directional mechanical seals, which facilitate extended service life.
One of the aims of the maintenance programme is to ensure that the Centre service facilities will be able to adapt to changes in demand brought about by the development of new amenities.
"There's always something happening," Derek Luke, a mechanical engineer working on the project, explained.
"Flexibility is therefore crucial if the system is going to be able to adapt to alterations following installation".
Once in place, Wilo pumps and inverters will help ensure the flexibility of the revamped hot water and air-conditioning system that will extend throughout the building's eight heating zones, which comprise LPHW air-handling units, constant temperature circuits and compensated LPHW radiators.
Wilo pumps and inverters, Derek also noted, will make the new system "more reliable, less prone to breakdowns and more adaptable to future developments".
• Wilo (UK): contact details and other news
• Email this article to a colleague
• Register for the free Processingtalk email newsletter
• Processingtalk Home Page


