Product category:
Process Control and Monitoring Systems
News Release from: Yokogawa Europe - Industrial Automation | Subject: Rabigh Project
Edited by the Processingtalk Editorial
Team on 09 February 2007
Record plant control system order for
PetroRabigh
Yokogawa receives record control system order for the Rabigh integrated refining and petrochemical complex in Saudi Arabia, one of the world's largest integrated refining and petrochemical complexes
Yokogawa receives record plant control system order for Rabigh integrated refining and petrochemical complex Yokogawa Electric Corporation has received an order to supply plant control systems for the Rabigh Project, which is constructing one of the world's largest integrated refining and petrochemical complexes in Saudi Arabia
This article was originally published on Processingtalk on 25 Jul 2008 at 8.00am (UK)
Related stories
Yokogawa FGD project for Romanian power plant
A Yokogawa consortium will supply electrical equipment and instrumentation for the flue gas desulphurisation systems at the Turceni thermal power plant, Romania's largest power station
Yokogawa strategic partnership with Gazprom Neft
Yokogawa Electric Corporation has signed a strategic partnership agreement with JSC Gazprom Neft, a major oil production and refining company in Russia
This project is under the management of the Rabigh Refining and Petrochemical Company (PetroRabigh), a joint venture between the Saudi Arabian Oil Company and Sumitomo Chemical Co.
Following the informal appointment of Yokogawa as the plant control system supplier for this project, the contract was formally concluded by Yokogawa Engineering Asia Pte, a wholly owned Yokogawa subsidiary.
In the Rabigh Project, which is slated for completion in the second half of 2008, PetroRabigh is enhancing an existing oil refinery at Rabigh on the Red Sea coast and constructing a new petrochemical complex that will annually produce 1.3 million tons of ethylene and 2.4 million tons of petrochemical derivatives such as polyethylene and polypropylene.
The new complex will be fully integrated with the existing refinery, which is currently undergoing an upgrade to a more sophisticated configuration.
This order for the Rabigh Project is for the upgrade of the control systems at the existing refinery and to provide control systems for the petrochemical plants that are being constructed.
The systems include the Centum CS3000 R3 integrated production control system, ProSafe-RS safety instrumented system, PRM plant resource manager, DPharp EJA pressure/differential-pressure transmitter, and OmegaLand integrated dynamic simulation environment.
This last product is manufactured by a Yokogawa subsidiary, Omega Simulation Co.
Delivery is scheduled for September 2007.
This is the largest ever Yokogawa order for a single project, and we believe we were awarded the contract because of the Saudi Aramco and Sumitomo Chemical evaluation of our product reliability and our proposal using solutions as seen from the user perspective.
We will strive to become the leading industrial automation company in the global market by 2010, by continuing to provide users with optimum solutions.
• Yokogawa Europe - Industrial Automation: contact details and other news
• Email this article to a colleague
• Register for the free Processingtalk email newsletter
• Processingtalk Home Page

